Sl No.Order No.PetitionerRespondant Description Order Date
1D.R.P.No.14 of 2014M/s.Elveety Industries Pvt. Ltd.TANGEDCO To make payment of sum of Rs.8,94,680/- being the interest due and payable to the petitioner against delayed payments 17/09/2021
2D.R.P.No.27 of 2013M/s.Techno Electric and Engineering Company Ltd.TANGEDCO & ANR. Direct TANGEDCO not to collect Operation and Maintenance charges for WEGs commissioned under IDC category and direct to delete Clause 5 Rate of Energy and other charges - sub clause (c) of the existing PPA under REC Scheme. 14/09/2021
3P.P.A.P.No.2 of 2021CE/NCES, TANGEDCO To procure 1000 MW of solar power from M/s. Solar Energy Corporation of India (SECI) under Manufacturing Linked ISTS scheme expected to be commissioned during 2022-23 at the rate of Rs.2.61 per unit (Applicable tariff of Rs.2.54 / Unit + SECI’s trade margin of Rs.0.07 / Unit) by executing Power Sale Agreement (PSA) on long term basis 07/09/2021
4D.R.P.No.1 of 2021M/s.Natesan Precision Components Pvt. Ltd.TANGEDCO To pass an order directing the Respondents to forthwith make payment of a sum of Rs.1,58,337/- being the sum due and payable to the petitioner against delayed payments made by TANGEDCO for power supplied07/09/2021
5D.R.P.No.2 of 2021M/s.Tamil Nadu Gears and Shaft CorporationTANGEDCO To pass an order directing the Respondents to forthwith make payment of a sum of Rs.5,70,585/- being the sum due and payable to the petitioner against delayed payments made by TANGEDCO for power supplied 07/09/2021
6D.R.P.No.3 of 2021M/s.Natesan Synchrocones P. Ltd.TANGEDCO To pass an order directing the Respondents to forthwith make payment of a sum of Rs.40,35,560/- being the sum due and payable to the petitioner against delayed payments made by TANGEDCO for power supplied 07/09/2021
7D.R.P. No.24 of 2014M/s. Bhabani Pigments Pvt. Ltd.TANGEDCO To pass an order directing the Respondents to forthwith make payment of a sum of Rs.38,95,122/- being the interest due and payable to the petitioner against delayed payments 01/09/2021
8M.P. No.33 of 2020M/s.Arulmozhi Spinning Mills Pvt. Ltd.TANGEDCO To take action against the Superintending Engineer, Tirunelveli EDC for under section 142 of the Electricity Act, 2003 for not complying with the orders of the Commission dated 22-09-2020 for release of payment for unutilized bank energy 01/09/2021
9D.R.P. No.4 of 2021M/s. Savita Oil Technologies Limited TANGEDCO To pass an order directing the Respondents to forthwith make payment of a sum of Rs.1,04,87,863/- being the sum due and payable to the petitioner against delayed payments01/09/2021
10M.P.No.5 of 2019Power Engineers Society of Tamil Nadu (PESOT) To withdraw “banking” on any generation as it is a financial injustice to the TANGEDCO and thereby the common consumers of this State and to dispense the status of Group Captive to wind generators and order to probe the status of Group Captive classification issued earlier in conformity to the act. 31/08/2021
11D.R.P.No.81 of 2014M/s. Dalmia Bharat Sugar and Industries Ltd.TANGEDCO To issue an interim order of stay and consequently direct the 4th respondent to make payment of total amount of Rs.3,80,96,452/- being the amount including the principal and interest amount due as on 24-11-2014 together with further interest 31/08/2021
12D.R.P. No.8 of 2019M/s.Ramnad Renewable Energy Ltd.TANGEDCO Direct Respondent to make payment of all Outstanding Invoices for the FY 2017-18 under the PPA amounting to Rs.16.80 Crore being the sum due 24/08/2021
13M.P.No.21 of 2021M/s.Eden Park Residents Welfare AssociationTANGEDCO To clarify the Tariff Order in T.P.No.1 of 2017 dated 11-08-2017 in paragraph 5.2.3.11, so as to include Water Treatment Plant, Sewage Treatment Plant and Life Safety Fire Hydrant pumping systems in the category of essential services24/08/2021
14R.P.No.5 of 2020 in M.P.No.27 of 2016TANGEDCOM/s.SEPC Power Pvt. Limited To Review Petition filed by the petitioner as against the order dated 10-01-2020 in M.P.No.27 of 201619/08/2021
15D.R.P.No.18 of 2013M/s.ITC Limited TANGEDCO Direct the Respondents to make payment of an amount of Rs.91,16,143/- together with further interest at the rate of 12% p.a17/08/2021
16D.R.P.No.18 of 2020Techno Electric and Engineering Company Ltd.TANGEDCO Direct the Respondents to forthwith make payment of a sum of Rs.8,83,62,129 being the sum due along with interest against delayed payments 17/08/2021
17D.R.P.No.14 of 2015M/s.Birla Carbon India Pvt. Ltd.TANGEDCO To release the outstanding payments to the Petitioner under the bills raised by the Petitioner in furtherance of the Tender bearing ref. No. Tender No. 05/TANGEDCO/2012, dated 27.11.2012 pertaining to the 10% of power supplied and billed over and above the contracted quantum as per the Power Purchase Agreement10/08/2021
18D.R.P.No.9 of 2019M/s.Aquasub Engineering TANGEDCO Set-aside the impugned communications dated 07-01-2015 issued to the petitioner for their HT SC No.444 demanding a sum of Rs.9,49,84,235/- and direct the respondents to refund the sum of Rs.4,34,23,477/- 10/08/2021
19D.R.P.No.29 of 2014M/s.Nalco Metal Products LimitedTANGEDCO Direct the respondents to forthwith make payment of a sum of Rs.3,02,975/- being the interest due and payable to the petitioner for power supplied10/08/2021
20M.P.No.21 of 2018Indian Wind Power AssociationTANGEDCO The prayer of the petitioner is to grant an interim order of stay of the Circular dated 03.10.2017 and Clarificatory Circular dated 06.06.2018 as being contrary to the orders passed by the Commission03/08/2021
21D.R.P.No.1 of 2016M/s.R.K.K.R.Steels LimitedTANGEDCO Direct the TANGEDCO to accept the invoice submitted by the petitioner for the payment of Rs.31,72,974/- being the 75% of the purchase rate i.e. Rs.2.90 paise per unit for 10,94,129 Units injected during April 2014 to 07.07.2015.03/08/2021
22M.P.No.25 of 2020 and M.P.No.26 of 2020M/s.Ramnad Renewable Energy Limited and M/s.Kamuthi Solar Power LimitedTANGEDCO To grant the petitioners a project specific extension of the Control Period from March 31, 2016 to the date of inter-connection of the Petitioners 72 MWs & 216 MWs projects to the grid, in order for the Respondent to pay the petitioner the tariff of Rs.7.01 per unit. 20/07/2021
23P.P.A.P.NO.1 OF 2021CE / PPP, TANGEDCO For adoption of tariff ranging from Rs.3.15 per unit to Rs.3.40 per unit at TANGEDCO periphery in procurement upto 1000 MW RTC power for the period from 15th February ’2021 to 20th May ‘2021 under Tender No. 12 of 2020.13/07/2021
24D.R.P.No.21 of 2020M/s.Techno Electric & Engineering Co. LimitedTANGEDCO The prayer of the Petitioner is to set aside the impugned communication in Lr. No. CE/ NCES/ SE/ Solar/ EE/ WPP/AEE3/F.Fees intimation/D.434/19, dated 12-04-2019 issued by the 4th Respondent in respect of the WEGs connected to the Palladam EDC. 13/07/2021
25D.R.P.NO.4 OF 2014M/s.B&G Solar Private LtdTANGEDCO To declare that the impugned communication in Letter No. SE/NEDC/NGT/AO/RCS/AS/F.HTSC-086/D.694/13, dated 09-12-2013 is illegal and contrary to the orders of the Commission and consequently set aside the same.13/07/2021
26T A No 2 OF 2020Arkay Energy(Rameswaram) LtdTANGEDCO To quash the impugned demand letter dated 05-05-2020 levying a sum of Rs.1,34,51,325/- as the dues payable for open access charges for April 2020 06/07/2021
27D.R.P.No.23 of 2020M/s.Grace Infrastructure Pvt. LimitedTANGEDCO The prayer of the Petitioner is to direct the respondents to forthwith pay to the petitioner a sum of Rs.80,81,31,929/- plus Rs.14,80,198.65 being the balance amount due for the period from 16-03-2017 to 07-12-2020 to the petitioner from TANGEDCO for power supplied from the wind generation units of the petitioner, together with interest @ 1% per month from 07-12-2020 till the actual date of payment 06/07/2021
28D.R.P.No.6 of 2016M/s.Kaveri Gas Power LimitedTANGEDCO The prayer of the petitioner is to declare that the omission to pay Rs.1,32,28,680/- by the Respondent, on the amounts refunded to the Petitioner pursuant to the order dated 24.9.2012 passed by the Hon’ble APTEL in A.P.No.40 of 2012 as contrary to the provisions of the Act and Regulations made thereon and to direct the Respondents to pay the Petitioner interest calculated at 16.50% p.a. in terms of the Act and the Regulations on the amount refunded 06/07/2021
29M.P No.10 of 2021M/s. CP Aquaculture (India) Pvt. Ltd.TANGEDCO To issue appropriate orders under the provisions of the Electricity Act, 2003 including if deemed fit action under section 142 for non-compliance 30/06/2021
30D.R.P No.19 of 2020M/s. Kandoi Clean EnergyTANGEDCO This petition has been filed with a prayer to direct the respondents to release the interest on delayed payment amount of Rs.38,49,447/- 30/06/2021
31T.A. No.3 of 2021Suryadev Alloys and Power Pvt Ltd.TANGEDCO To quash the demand letter dated 07-05-2020 bearing ref. Lr. No.SE/CEDC/N/AAO/HT/F.Suryadev CPP/D.1724/20, levying a sum of Rs.1,19,94,190/- 29/06/2021
32T A No 6 of 2021TCP LimitedTANGEDCO To quash the demand notices and seeking to levy Rs.72,87,516/-; Rs.41,82,021/- and Rs.43,21,423/- as open access charges29/06/2021
33T A No 4 of 2021Sree Rengaraj Ispat Industries P. Ltd. To call for the records of the 3rdRespondent’s impugned demands dated 30-04-202029/06/2021
34T A No 5 of 2021ARS Energy Private LimitedTANGEDCO To quash the demand notice bearing dated 04-04-2020 and dated 07-05-2020 seeking to levy a sum of Rs.77,68,827/- and Rs.44,84,914/- 29/06/2021
35T.A. No.1 of 2021OPG Power Generation Private LimitedTANGEDCO Dispense with the production of the original of the impugned demand letters, in respect of the Medium Term Open Access Agreement (“MTOA”) dated 27-09-2019 in respect of its 56.366 MW 29/06/2021
36T.A.No.2of 2021OPG Energy Private LimitedTANGEDCO To call for the records of the 2ndrespondent vide impugned Invoice No. 193 dated 17-04-2020 for Transmission, Wheeling & Scheduling & System Operating Charges 29/06/2021
37M.P. No.23 of 2021TANTRANSCOnil Seeking extension of time upto 30-06-2021 for filing Aggregate Revenue Requirement for the MYT control period from FY 2019-20 to FY 2023-2422/06/2021
38D.R.P. No.20 of 2014Krishna Kumar Orthopaedic HospitalTANGEDCO The prayer of the petitioner in D.R.P. No. 20of 2014 is to pass an order directing the Respondents to forthwith make payment of a sum of Rs.3,63,152/- being the interest due 15/06/2021
39R.A. No.1 of 2020M/s.ASE Structure Design Private LimitedTamil Nadu Electricity Board The prayer of the petitioner in R.A. No.1 of 2020 is to call for the records from the respondents 1 & 2 and quash the same and pass such further or other order as this Commission may deem fit and proper. 15/06/2021
40D.R.P. No.18 of 2014M/s. Om Sakthi Wind Power Private LimitedTANGEDCO The prayer of the petitioner in D.R.P. No. 18of 2014 is to pass an order directing the Respondents to forthwith make payment of a sum of Rs.21,26,998/- being the interest due 15/06/2021
41D.R.P. No.22 of 2014M/s. Texonic InstrumentsTANGEDCO The prayer of the petitioner in D.R.P. No. 22of 2014 is to pass an order directing the Respondents to forthwith make payment of a sum of Rs.48,78,526/- being the interest due 15/06/2021
42M.P. No.16 of 2019TANTRANSCOnil To accord approval for the Capital Investment Plan for the FY 2019 – 20 for Rs.4493.09Crores, for FY 2020-21 for Rs.2737.31 Crores and for FY 2021-22 for Rs.4887.85 Crores 15/06/2021
43M.P. No.17 of 2019State Load Despatch Centre (SLDC), TNEBNil The petition filed is for approval of Capital Investment Plan for the control period of FY 2019-20, FY 2020-21 & FY 2021-22.15/06/2021
44D.R.P. No.27 of 2014M/s. Devi Sea Foods Ltd. TANGEDCO The prayer of the petitioner in D.R.P. No. 27 of 2014 is to pass an order directing the Respondents to forthwith make payment of a sum of Rs.1,37,70,700/- being the interest due 15/06/2021
45D.R.P No.2 of 2015M/s. Sunil Wind EnergyTANGEDCO To pass an order directing the respondents to forthwith make payment of a sum of Rs.3,45,613/- being the interest due 05/05/2021
46D.R.P No.54 of 2014M/s. National Energy Trading and Services LimitedTANGEDCO To issue appropriate directions to the respondents to pay an amount of Rs.33,13,26,583/- to the petitioner 05/05/2021
47D.R.P No.5 of 2017M/s. Al Ameen Green Energy Private LimitedTANGEDCO To quash the order of the 2nd respondent made in Lr.No.CE/NCES/SE/SOL/EE/SCB/A1/F.Al Ameen/ D.861/17, dated 18-09-201723/04/2021
48D.R.P No.4 of 2017M/s. Al Ameen Green Energy Private LimitedTANGEDCO To quash the order of the 2nd respondent made in Lr.No.CE/NCES/SE/SOL/EE/SCB/A1/F.AlAmeen/ D.859/17, dated 18-09-201723/04/2021
49D.R.P.No.32 of 2014M/s.The Metal Powder Company LimitedTANGEDCO To direct the Respondents to forthwith make payment of a sum of Rs.1,09,81,922/- being the interest due and payable to the petitioner against delayed payments 20/04/2021
50D.R.P. No.66 of 2014Samalpatti Power Company Private LimitedTANGEDCO To set asidethe action of the 1st respondent in making a deduction of Rs.5,82,71,744/-15/04/2021
51M.P.No. 18 of 2020TANGEDCOTASMA,IWPA etc To uphold the obligation of the State Distribution licensee in terms of power purchase agreements has been and continues to be stranded and there is an unavoidable obligation and incidence to bear fixed costs consequent to such agreements etc.,.15/04/2021
52R.A.No.5 of 2020Union of India/Southern RailwayTANGEDCO To issue an interim directive to the respondents herein to issue “No Objection Certificate” and Concurrence to this petitioner15/04/2021
53D.R.P. No.65 of 2014Madurai Power Corporation Private Limited To set aside the action of the 1st respondent in making a deduction of Rs.6,01,08,547/-15/04/2021
54D.R.P. No.4 of 2020M/s. Wind Urja India Private LimitedTANGEDCO To direct the respondent to strictly comply and abide with the provisions of the EPAs entered into between the Petitioner and the Respondent etc15/04/2021
55D.R.P. No.3 of 2020M/s. Ratedi Wind Power Private Limited,MumbaiTANGEDCO To direct the respondent to strictly comply and abide with the provisions of the EPAs entered into between the Petitioner and the Respondent 15/04/2021
56D.R.P. No.31 of 2014M/s.Hindustan Platinum Private LtdTANGEDCO To direct the Respondents to forthwith make payment of a sum of Rs.67,28,754/- being the interest due 30/03/2021
57M.P. No.14 of 2017M/s. Ambika Cotton Mills Ltd./TANGEDCO To pass an order prescribing a procedure on the priority of adjustment of wind energy30/03/2021
58D.R.P. No.23 of 2014M/s. Maris Hotels & Theatres (P) LimitedTANGEDCO To direct the Respondents to forthwith make payment of a sum of Rs.42,69,892.09 being the interest due30/03/2021
59D.R.P. No.21 of 2014M/s. Maris Spinners LimitedTANGEDCO To direct the Respondents to forthwith make payment of a sum of Rs.5,37,633/- being the interest due23/03/2021
60I.A. No.1 of 2020 in D.R.P. No.78 of 2014 and D.R.P. No.78 of 2014M/s. KCP LTD., (H.T.SC.No.1044)TANGEDCO to direct the Respondent to call for the records relating23/03/2021
61D.R.P. No.19 of 2014M/s. Sree Rayalaseema Hi Strength Hypo Ltd.TANGEDCO To direct the Respondents to forthwith make payment of a sum of Rs.2,84,08,557/- being the interest due23/03/2021
62D.R.P. No.40 of 2014M/s. NuPower Renewables LimitedTANGEDCO To direct the respondents to immediately make payment of Rs.10,19,85,632/- being the interest accrued23/03/2021
63D.R.P. No.25 of 2014M/s.Brilliant Bio Pharma LimitedTANGEDCO To prayed to pass orders based on the Memo filed by TANGEDCO.23/03/2021
64D.R.P. No.9 of 2014M/s. Savita Oil Technologies LimitedTANGEDCO To pass an order directing the Respondents to forthwith make payment of a sum of Rs.1,76,21,948/- being the interest due16/03/2021
65D.R.P. No.15 of 2014M/s. Sri Kumaraswamy Mineral Exports Pvt. Ltd.TANGEDCO To pass an order directing the Respondents to forthwith make payment of a sum of Rs.1,11,30,893/- being the interest due16/03/2021
66D.R.P.No.17 of 2012M/s.PTC INDIA LTDTANGEDCO To declare that no force majeure condition existed for non-supply of electricity by M/s. Padmaadevi Sugars Limited under the PPA16/03/2021
67D.R.P. No.6 of 2020M/s. Kamal Encon Industries LimitedTANGEDCO To pass an order directing the Respondents to make payment of a sum of Rs.22,85,818/- being the interest due16/03/2021
68D.R.P. No.8 of 2014M/s.India Fashions Ltd.TANGEDCO To pass an order directing the respondents to forthwith make payment of a sum of Rs.17,96,133/- being the interest due16/03/2021
69R.A. No.8 of 2019M/s.Sutherland Global Services Pvt. Ltd. M/s.K.G. Information Systems Private LimitedSecretary Energy Dept. Govt. of Tamil Nadu Chairman TANGEDCO & 2 OTHERS Directing the respondent to include IT enabled services under 9.11.2 of Tariff Order in T.P. No.3 of 2010 dated 31-07-2010.09/03/2021
70M.P.No.11of 2021The Chief EngineerProtection and Communication, Tamil Nadu Transmission Corporation Limited,NIL Approves the proposal of the Chief Engineer Protection and Communication TANTRANSCO for adoption of Hybrid(SDH and MPLS-TP technology for Fiber optic Terminal Equipment in 230 KV and above level sub stations and Multi Protocol Label Switching – Transport profile MPLS-TP technology for FOTE in 110 KV sub stations.09/03/2021
71D.R.P. No.3 of 2019M/s. Tulsyan NEC LtdCE GRID OPERATION SE CEDC NORTH Direct the Respondents to restore and recoup the 7,05,559 units said to have been lapsed due to over injection when reading was taken at 15 minutes time block in captive consumers end or direct the respondents to pay Rs.44,80,300 being the value of the energy lapsed 02/03/2021
72M.P. No.4 of 2021TANGEDCOnil Directing TANGEDCO to include the tariff clarification items in their tariff petition to be filed so as to get the views of the stakeholders and to decide the matter.02/03/2021
73D.R.P. No.8 of 2016M/s. MALCO Energy LimitedTANGEDCO PTC INDIA LTD. Directing the respondents are directed to calculate the units injected into the second respondent’s grid by the petitioner from 01-06-2010 to 03-06-2010 and pay the applicable tariff to the petitioner within 30 days.02/03/2021
74M.P. No.8 of 2021TANTRANSCONIL To grant further time extension for filing Aggregate Revenue Requirement for the MYT control period FY 2019-20 to FY 2021-22 till 30 th April 2021.23/02/2021
75D.R.P. No.51 of 2014Lanco Tanjore Power Company LimitedCHAIRMAN TNEB TANGEDCO To issue appropriate directions to the Respondent (subject to prudence check) to pay an amount of Rs.32,05,74,595 to the Petitioner towards refund/reimbursement of the MAT paid by the Petitioner09/02/2021
76R.A. No.3 of 2020TANGEDCOIND BHARATH & 2 OTHERS To fix a tariff from June 2011 to May2012 for purchase of power by TANGEDCO from the Generators09/02/2021
77D.R.P. No.7 of 2016 M/s. Cauvery Power Generation Chennai Pvt. LtdTANGEDCO SE CEDC NORTH To declare that the omission to pay interest by the Respondent, on the amounts refunded pursuant to the order dated 15.9.2014 passed by the Commission09/02/2021
78D.R.P. No.1 of 2020 M/s. Pandian Chemicals Limited CMD TANGEDCO & 6 OTHERS To pass on order or directions to the respondents to refund (or) Issue "CREDIT NOTE" for outstanding dues and interest payable02/02/2021
79D.R.P. No.7 of 2020 M/s VSR Solar Power Private Limited CMD TANTRANSCO & 3 OTHERS Grant the Petitioner a project specific extension of the COD by eighteen months i.e. 21.3.2019 to 21.9.2020 in respect of the Petitioner’s SPG under PPA etc02/02/2021
80D.R.P. No.8 of 2020 M/s Raasi Green Earth Energy Private LimitedTANTRANSCO CE NCES To grant the Petitioner a project specific extension of the COD by fifteen (15) months in respect of the Petitioner’s SPG under PPA dated 26-9-201902/02/2021
81D.R.P.No.25 of 2012M/s PTC India LimitedM/s. Auro Mira TANGEDCO To allow the present petition by declaring that the Respondent No.1 i.e. Auro Mira Energy Company Private Limited (“Auro Mira”)02/02/2021
82T.A.No.1 of 2020tangedcoTrichy Cold Storage P Ltd. Association of Cold Storages To hold that inviting comments from the stakeholders for applicability of tariff for cold storage units need not be considered and the working instruction issued by TANGEDCO02/02/2021
83M.P. No.3 of 2020Thiru N. Alagu NarayananTANTRANSCO Thiru N. Alagu Narayanan / The prayer of the Petitioner in M.P. No.3 of 2020 is quash with immediate effect the CE/Civil/Transmission/TANTRANSCO’s Letter No.CE/C/TR/SE/CI/EE-I/F.T.SEPC/LOA/D292/19, dated 05-03-201902/02/2021
84D.R.P No.49 of 2014M/s. Coimbatore Pioneer Fertilizers Ltd.TANGEDCO M/s. Coimbatore Pioneer Fertilizers Ltd./ The prayer of the Petitioner in D.R.P. No. 49 of 2014 is to pass an order directing the respondents to forthwith make payment of a sum of Rs.68,14,158/- being the interest due02/02/2021
85M.P. No.35 of 2020Tamil Nadu Generation and Distribution Corporation Ltd. (TANGEDCO)NIL TANGEDCO / The prayer of the Petitioner in this M.P. No.35 of 2020 is to grant the time extension for filing True-up of ARR for FY 2016-17, FY 2017-18, FY 2018-19 and FY 2019-2002/02/2021
86M.P. No.38 of 2020Tamil Nadu Transmission Corporation Ltd.NIL TANTRANSCO / The prayer of the Petitioner in this M.P. No.38 of 2020 is to grant the time extension for filing Aggregate Revenue Requirement for the MYT control period FY 2019-20 to FY 2021-2202/02/2021
87M.P. No.3 of 2019TANGEDCO TANGEDCO / The prayer of the petitioner in M.P. No.3 of 2019 is to approve the draft procedure as enclosed in Annexure I to be adopted by TANGEDCO for repowering the existing Wind Electricity Generators etc.02/02/2021
88M.P.No.37 of 2020Tamil Nadu Generation and Distribution Corporation LtDNIL TANGEDCO / To approve procurement of RTC power upto 1000 MW for the supply period from 15-02-2021 to 20-05-2021 etc.,05/01/2021
89M.P. No.21 of 2020CREDAI CHENNAITANGEDCO M/s CREDAI CHENNAI / To issue appropriate clarifications and directions that would allow for the implementation of the Amendment to the Tamil Nadu Electricity Distribution Code, Notification No.TNERC/DC/8-25, dated 18.12.2019 published in the Tamil Nadu Government Gazette on 29.1.202005/01/2021