Sl No.Order No.PetitionerRespondant Description Order Date
49M.P. 28 of 2021Thiru B. Balamurali, Pollachi TANGEDCO To treat the Petitioners LTSC No. 347003395 under LT Tariff IIIB as per Tariff Order No.1 of 2017 dated 11.07.2017 instead of LT Tariff V pending disposal of the above petition and punish the 1st and 2nd Respondent under Section 142 of the Electricity Act, 2003 for contravening the Tariff Order No.1 of 2017 05/05/2022
48D.R.P. No.35 of 2014M/s.TCP Limited To direct the Respondent to refix the demand and energy quota for the petitioner taking into account the unique circumstances of the petitioner so as to permit the petitioner 05/05/2022
47D.R.P. No.11 of 2016M/s.Orchid Pharma Ltd.TANGEDCO To quash the 1st Respondents demand notice dated 29-07-2015 and consequently direct the 2nd Respondent to give adjustment for the unutilized banked wind energy05/05/2022
46M.P. 42 of 2021M/s.O.P.G.Energy Pvt. Ltd.TANGEDCO To hold and clarify that no wheeling charges are payable to the Respondent, in case the Petitioner sources captive power to the Respondent No.2 through its 11 KV dedicated transmission line05/05/2022
45M.P.No. 25 of 2015Chief Electrical Distribution Engineer, Southern RailwaysTANGEDCO To direct TANGEDCO not to levy surcharge for harmonics, as far as Railway Traction is concerned, till such time a final decision is taken by CEA on the revision of the Technical Standards for Grid Connectivity Regulation and to direct TANGEDCO to refund the harmonic surcharges of Rs.73.98 lakhs05/05/2022
44M.P. No.14 of 2022State Load Despatch Centre (SLDC) To modify the order dated 15.06.2021 in M.P. No. 17 of 2019 in so far as para 6.9 (h) as submitted in the petition.05/05/2022
43R.A.No.1 of 2021M/s. Walwhan Renewable Energy Limited & M/s.National Solar Energy Federation of India LimitedTANGEDCO Petitioners preferred appeals before the Hon’ble Appellate Tribunal for Electricity against the suo motu order issued by this Commission in Order No.2 of 2016 dt. 28.03.2016 determining tariff for solar power 05/05/2022
42DRP No9 of 2020M/s.Tirunelveli Solar Project Private Limited,Rajasthan TANGEDCO The prayer of the petitioner in this D.R.P.No.9 of 2020 is to grant the petitioner an extension of the commercial operation date from 26-09-2017 till 30-01-2019 05/05/2022
41DRP No 19 of 2021M/s. OPG Power Generation Pvt. Ltd. The prayer of the petitioner in D.R.P. No.19 is to (a) declare that the events enumerated in the Table No 1 of paragraph 2 constitute Change in Law events 05/05/2022
40M.P. No.34 of 2020TANGEDCOM/s.CWRE Wind Power Pvt. Ltd. To cancel captive wheeling of energy in respect of M/s.CWRE Wind Power Pvt. Ltd., with effect from 13-06-2018 treated as third party transaction as per law and their captive users are liable to pay Cross Subsidy Surcharge for such disqualification of captive status.05/05/2022
39M.P.No. 43 of 2021Chief Electrical Traction Engineer, Southern Railway To direct TANGEDCO to permit provision of net metering for all the locations listed in NOC application under 4MW dated 10.03.2021 within a timeline and to punish the Respondent for non-compliance of the order 05/05/2022
38P.P.A.P.No.2 of 2022TANGEDCO To approve for adopting the tariff of Rs.2.99 per unit under PM-KUSUM scheme. 26/04/2022
37M.P.No.19 of 2021M/s. R.S.Yarns and Power (Pvt) Ltd,TANGEDCO To issue clarification as to whether additional surcharge on wheeling charges applicable to the open access consumers having drawal voltage over and above 66 kV who source electricity from the Third party Power Generators having injection voltage over and above 66 kV or not26/04/2022
36MP No 7 of 2021TANGEDCOSai Regency Power Corporation Private Limited and Others To declare M/s. Sai Regency Power Corporation Pvt Limited, HT. SC. No. 059124780032, Ramnad EDC is not a Captive Generating Plant for the Financial Year 2019-2019/04/2022
35D.R.P.No.11 of 2019M/s.Ratedi Wind Power Pvt. LtdTANGEDCO Direct the Respondent to refund the balance amount of Rs.5,72,62,542/- for the period upto March 2018 that has been collected on the basis of erroneous application of the Amendment dated 19-06-2013 along with interest of Rs.2,28,30,563/19/04/2022
34D.R.P.No.48 of 2014M/s. Super Sales India LimitedTANGEDCO To set aside the impugned Lr.No.CFC/FC/REV/AAO/HT/D.541/2013 dated 29-08-2013 issued by the 2ndRespondent19/04/2022
33D.R.P.No.2 of 2018M/s The Ramco Cements LimitedTANGEDCO The prayer of the petitioner in D.R.P. No. 2 of 2018 is to pass an order directing the Respondents to pay a sum of Rs.3,89,55,341/- towards excess energy pumped 12/04/2022
32D.R.P.No.3 of 2018M/s.The Ramco Cements LimitedTANGEDCO The prayer of the petitioner in D.R.P. No. 3 of 2018 is to pass an order directing the Respondents to pay a sum of Rs.1,18,86,792/- towards excess energy pumped 12/04/2022
31D.R.P.No.16 of 2021M/s. Wind Construction LimitedTANGEDCO Direct the respondents to make payment towards invoices due as of 31-07-2021 of a value of Rs.40,85,02,740/- (i.e. July 2020 to July 2021) and accrued interest thereon of Rs.1,18,49,644/- (i.e. July 2020 to July 202112/04/2022
30R.P.No.8 of 2021 in D.R.P.No.18 of 2013.TANGEDCOM/s.ITC Limited Review Petition against the Order dated 17-08-2021 in D.R.P.No.18 of 2013 passed by the Commission12/04/2022
29D.R.P.No.8 of 2021M/s.NVR Energy Pvt. LimitedTANGEDCO & Ors. To set out the methodology and manner of implementing Clauses 5(c) and 7(c) of the PPA for the purposes of billing and accounting for energy drawal 05/04/2022
28M.P.No.24 of 2021CFC/Revenue, TANGEDCO To fix the order of adjustment of the open Access energy against HT consumption 05/04/2022
27M.P.No.22 of 2020CE/Commercial, TANGEDCOM/s.PQ Welfare Consortium, Coimbatore - Impleading Petitioner To approve the new methodology discussed in para 9 above for measurement of Harmonics with the HT/EHT consumers 05/04/2022
26P.P.A.P.No.1 of 2022CE/PPP, TANGEDCO For adoption of tariff at Rs.4.82 per unit for 325 MW RTC power and Rs.4.84 per unit for 150MW RTC power at TANTRANSCO periphery 05/04/2022
25D.R.P.No.9 of 2021M/s.Narbheram Solar TN Pvt. LimitedTANGEDCO & Ors. To set out the methodology and manner of implementing Clauses 5(c) and 7(c) of the PPA for the purposes of billing and accounting for energy drawal05/04/2022
24M.P.No.10 of 2022TANGEDCO To modify the order dated 12-10-2021 in M.P. No. 18 of 2019 in so far as para 5.50 (k) 05/04/2022
23M.P.No.1 of 2021M/s.NLC India Limited(i) TANGEDCO (ii) TANTRANSCO To direct SLDC to strictly follow and enforce "MUST RUN" status on all Solar and Wind Power Plants and to direct SLDC to forthwith stop issuing Backing down/Curtailment instructions to Solar and Wind Plants05/04/2022
22M.P.No.20 of 2019TANGEDCOM/s.NuPower Wind Farms Limited To confirm that the methodology prescribed in the impugned circular of the TANGEDCO that the generation of electricity and other aspects arising out of it such as Captive Norms verification have to be done based on Energy Wheeling Agreement05/04/2022
21M.P.No.48 of 2021CE/PPP, TANGEDCO To accord approval to float a medium term tender under FOO guidelines with the deviations proposed in the Bidding Documents in line with Pilot Scheme -II for purchase of 1500 MW RTC power for a period of 5 years appointing M/s. PTC as an Aggregator.31/03/2022
20D.R.P.No.11 of 2021M/s. Hindustan Zinc LimitedTANGEDCO To direct the Respondents to strictly comply and abide with the provisions of the fourteen PPAs entered into between the Petitioner and the Respondent(s). 29/03/2022
19M.P.No.5 of 2021TANGEDCOM/s.OPG Energy Pvt. Ltd. To declare that the petitioner is not a Captive Generating Plant for the financial years 2019-20 and their captive users are liable to pay Cross Subsidy Surcharge 22/03/2022
18M.P.No.20 of 2020M/s.TamilNadu Spinning Mills AssociationTANGEDCO To punish the Respondent / Contemnor, for having violated the order of this Commission passed in Order No. 2-5 dated 11.10.2008, in so far as the matter of collection of Scheduling and System Operation Charges are concerned 22/03/2022
17D.R.P.No.3 of 2015M/s.Lanco Tanjore Power Company Ltd. Directing the Respondents to forthwith make payment of a sum of Rs.50,70,03,194/- being the interest due and payable to the petitioner as on20-12-2014 together with further interest22/03/2022
16M.P. No.22 of 2021TANGEDCOM/s. Suryadev Alloys and Power Pvt., Ltd & others Direct the Respondents to pay the Applicant a sum of Rs.151,28,20,794/-towards Cross Subsidy Charge for disqualification of captive status for the Financial Year 2019-2020, within a time to be fixed by the Commission and to declare that M/s.Suryadev Alloys & Power Private Limited, HTSC No. 019104041976 EDC, Chennai North is not a Captive Generating Plant for the Financial Year 2019-20 and their captive users are liable to pay Cross Subsidy Surcharge22/03/2022
15D.R.P. No.2 of 2022M/s.GMR Energy Trading Ltd.TANGEDCO To direct TANGEDCO to pay the outstanding LPS amount payable to petitioner of Rs.3,12,19,097/- (Rupees Three Crore Twelve Lakh Nineteen Thousand and Ninety Seven only) for the delay in payment of Monthly Bills / Invoices raised by the petitioner 15/03/2022
14M.P.No.4 of 2022CE/PPP, TANGEDCO To Approve procurement of RTC power of 500 MW for March ’2022, 1000 MW for April ’2022 and 1000 MW for May ’2022 (01.05.22 to 20.05.2022 and 1000 MW for the evening peak hours for the period from 01.03.2022 to 20.05.2022. 15/03/2022
13D.R.P.No.20 of 2021M/s. Bhabani Pigments Pvt. Ltd.TANGEDCO To direct the Respondents to forthwith make payment of a sum of Rs.90,62,345/- (Rupees Ninety Lakhs Sixty Two Thousand Three Hundred and Forty Five only) being the interest due and payable to the petitioner till 30-11-2021 15/03/2022
12M.P. No.1 of 2022CE/NCES, TANGEDCO To amend the Commission’s Grid Interactive Solar PV Energy Generating System(GISS) Regulations,2021for extending Net feed-in methodology to all HT consumers for the establishment of roof top / ground mounted SPV plants 01/03/2022
11M.P. No.44 of 2021M/s.Nagai Power Pvt. Ltd.TANGEDCO To clarify that Transmission Charges are not payable for the month of September 2021 in respect of Format STOA2 dated 23.08.2021 01/03/2022
10S.M.P. No.1 of 2021Suo-Motu Proceedings Suo-Motu Proceedings in the matter of Fees and Fines Regulations23/02/2022
9M.P No.38 of 2021M/s.OPG Power Generation Pvt. Ltd.TANGEDCO To impose penalty upon the Respondents in accordance with section 142 of the Electricity Act, 2003 for non-compliance of the order of the Commission dated 15-12-2020 in M.P. No.7 of 201923/02/2022
8M.P.No.12 of 2021TANTRANSCO To approve to continue to collect the O&M Charges for the Maintenance of Bays provided to the intra-state Fossil fuel based generators15/02/2022
7M.P.No.32 of 2021M/s.Birla Carbon India Pvt. LimitedTANGEDCO To issue appropriate directions to the levy additional surcharge as fixed on OA 08/02/2022
6D.R.P.No.2 of 2016M/s.DCW Limited TANGEDCO Direct the Respondent to declare the actions of the Respondents reflected in the position taken in Order No. PTC/MTFG/DCWL/3889 dated 03.07.2009 as arbitrary and illegal and quash the same 08/02/2022
5M.P.No.2 of 2022CE/PPP, TANGEDCO To approve procurement of RTC power upto 1000 MW for the period from 01.03.2022 to 31.03.2022 and to float Tender No TANGEDCO/SHORT/PP-17-2022 for the procurement RTC power up to 1000 MW for the supply from 01.03.2022 to 31.03.2022 through e-Bidding portal (DEEP), as per the enclosed Tender Specification (RfP). 25/01/2022
4D.R.P.No.7 of 2021Grace Infrastructure Pvt. LimitedTANGEDCO To direct the Respondents to forthwith pay to the Petitioner a sum of Rs.17,04,11,543/- (Rupees Seventeen Crore Four Lakh Eleven Thousand Five Hundred and Forty Three only) being the deficit amount to be paid to the petitioner by TANGEDCO for the period from FY 2013-14 to 2017-18 plus interest of Rs.11,03,76,188/- upto 05-07-2021 19/01/2022
3I.A. No.1 of 2021 in R.P.No.3 of 2021 in D.R.P.No.23 of 2020M/s.Grace Infrastructure Pvt. Ltd.TANGEDCO To review/modify the observation in para 6.1 of the order dated 06.07.2021 in D.R.P.No. 23 of 2020 that the petitioner has not denied their liability in respect of the demand for Rs.4,44,25,923/-,19/01/2022
2P.P.A.P.No.4 of 2021CE/NCES, TANGEDCO Prayer of the Petitioner is to adopt tariff ranging from Rs.4.50 per unit at TANGEDCO periphery in procurement of 180 MW RTC power for the period from 6th September ’2021 to 30th September ’2021 under Tender No. 13 of 2021. ii. For approval for the procurement of 107.506 MU for the period from 6th September ’2021 to 30th September ’2021. 11/01/2022
1M.P.No.46 of 2021TANGEDCO To approve procurement of 600 MW during evening hours (17:00 to 22:00 hours) for the period from 22.11.21 to 31.12.21. 11/01/2022